Continuous traces on the EN125 can be revised on a case-by-case basis
The continuous lines created by the recent works on the EN125, between Vila do Bispo and Olhão, may be revised «case by […]
The continuous lines created by the recent works on the EN125, between Vila do Bispo and Olhão, may be revised «case by […]
The EN125, on the section between Lagos and Olhão, «is already a real alternative to Via do Infante». The words are from […]
The Alcantarilha/Armação roundabout is already repaved, the EN125 before the Fontainhas roundabout is also the Fatacil area, in […]
Last January, when he came to the Algarve to announce the resumption of work, after a long break, the Minister of Infrastructure […]
The “placement of prefabricated concrete elements, beams and pre-slabs, in the overpasses of the Maritenda railway and […]
The paving work on the section of the EN125 that crosses the town of Odiáxere, in the municipality of Lagos, requires […]
The works on the west tower of Ponte Nova over the Arade River, on the EN125, between Lagoa and Portimão, are «almost» […]
The second part of the demolition of the overpasses to the Maritenda and Fontainhas railway, on the EN125, will […]
The company Infraestruturas de Portugal (IP) guarantees that the ongoing works on the 105 km section of the EN125 between […]
The work on the new roundabout next to FATACIL, on the section of the EN125 that crosses Lagoa, has already started, but it is necessary […]
Motorists who want to drive to Faro (and to the airport) should avoid using the stretch of EN125 between São João […]