
Albufeira: mid-slope collectors are advancing «already». Tunnel to avoid flooding will have to wait
Co-payment will be fundamental so that the tunnel work can be carried out
Co-payment will be fundamental so that the tunnel work can be carried out
Armação de Pêra's General Rain Drainage Plan will be presented on February 10, at 18 pm, […]
A large tunnel that will divert the flow of the Albufeira stream from downtown towards […]
The Albufeira Basin Drainage Plan, which aims to solve most of the problems that lead to periodic flooding […]