Infraestruturas de Portugal works on the Southern Line to increase train speed
To reinforce the load capacity and circulation of the railway infrastructure
To reinforce the load capacity and circulation of the railway infrastructure
The means of combat are also being reinforced
Group of citizens presented suggestions, within the scope of the public discussion of the National Railway Plan
The fact that there are two alternatives for the future reformulation of the Southern Line is the way "to do none".
The creation of a new connection that places Faro, Beja and Évora on the same railway axis
Investment is carried out within the scope of the program for the modernization and expansion of the Rede Ferroviária Nacional Ferrovia2020
Work assignment notice was signed this Tuesday, September 28
Structures were intervened in Ourique, Grândola, Álcacer do Sal and Setúbal
Fire has two active fronts
Intervention will cost around 750 euros
All that's left is "the last authorizations", guaranteed the vice-president of Infraestruturas de Portugal